Municipal Engineering: 

 
Design and construction services for the trenchless replacement of 1300 m of the 900 mm dia. Gloucester Street watermain, including an assessment of available trenchless watermain rehabilitation technologies, Region of Ottawa-Carleton.  The approximate construction cost was $1,700,000.
 
 
Odour Control Study for 22 kms of the Interceptor Sewer, Outfall Sewer and Rideau River Collector trunk sewer system, and preliminary and detailed design of odour control facilities, City of Ottawa.
 
 
Odour and Corrosion Control Study for the Glen Cairn Trunk Sewer, including the environmental assessment and preliminary design of a 6900 m3/hr biofilter, City of Ottawa.  The approximate construction cost was $750,000.
 
 
Design and field services for 54,600 cu.m. Orleans Water Reservoir Expansion and 2,400 l/s Forest Ridge Pumping Station, Region of Ottawa Carleton.
 
 
Design and field services for the $6,000,000. Ottawa South Reservoir and Pump Station, Region of Ottawa-Carleton.
 
 
Design and field services for the 2,000 mm diameter sewer for flood control and slope stabilization of the Jasmine and Laporte Ravines, Rideau Valley Conservation Authority.
 
 
Design and field services for 1,200 mm diameter, 1500 metre long Maxime Sanitary Collector Relief Sewer, Region of Ottawa-Carleton.
 
 
Sanitary Sewer infrastructure studies, including flow monitoring, for the Cities of Ottawa, Kanata, Nepean and Gloucester, Goulbourn Township and the Region of Ottawa-Carleton.
 
 
Local improvement works, including roadways, and sanitary and storm sewer systems, Cities of Kanata and Gloucester and Township of Goulbourn.
 
 
Western Growth Area Sanitary Sewer Study for upgrading the trunk systems for a population of 150,000, Region of Ottawa-Carleton.
 
 
Field services for storm sewer outlet and stormwater management pond at the Ottawa MacDonald-Cartier International Airport, with a construction value of $2,500,000, Transport Canada.
 
 
Design and field services for 1200 mm dia., $5,000,000. Glen Cairn Sanitary Collector Sewer, Region of Ottawa-Carleton.
 
 
Master servicing plan of water and sewage systems for an ultimate population of 8,000 people in the Village of Manotick, including options for water supply, treatment and distribution and sanitary sewers, pump stations and sewage treatment facilities, Township of Rideau.



 
Transportation:

 
Preliminary design and environmental assessment for the realignment and signalization of Hunt Club Road West at Moodie Drive, with a construction value of $1,200,000, Region of Ottawa-Carleton.
 
 
Environmental assessment, detail design and construction services for 2.5 km of new urban and rural roads (Iber Road, Abbott Street and Shea Road) including storm sewers, sanitary sewers and watermains, Township of Goulbourn.  The construction cost was $1,800,000.
 
 
Design and construction services for the reconstruction of 1.3km of Queensdale Avenue to semi-urban standards, including perforated storm sewer system and watermains, City of Gloucester.  The construction cost was $1,400,000.
 
 
Design and construction services for the reconstruction of 1.3 km of Page Road to urban standards including storm sewers and watermains, City of Gloucester.  The construction cost was $1,300,000.
 
 
Preliminary and detail design to reconstruct 3.5 km of Eagleson Road to four and six lane urban arterial standards, with a construction cost of $8,500,000, Region of Ottawa-Carleton.
 
 
Functional design and environmental study (ESR) for upgrading 8.5 km of March Road to four lane arterial, with a construction value of $34,000,000, Region of Ottawa-Carleton.
 
 
Realignment and reconstruction of taxiways and upgrading of auxiliary roads and parking lots at the Ottawa MacDonald-Cartier International Airport.
 
 
Preliminary and detail design and field services for 1.5 km of Abbott Street to urban collector standards, with a construction cost of $1,500,000, Goulbourn Township.
 
 
Road needs and road management studies, Goulbourn, West Carleton, Roxborough and South Gower Townships.
 
 
Traffic calming study and strategy for Fortune Drive, City of Gloucester.
 
 
Traffic impact study and preliminary and detail design of improvements for a proposed development, Hazeldean Road, City of Kanata.



 
Snow Disposal Facilities:

 
Michael Snow Disposal Facility background studies, and preliminary and detail design of a 10.5 ha site, including reconstruction of the South Cyrville Municipal Drain, with a construction cost of $3,000,000, Region of Ottawa-Carleton.
 
 
Conroy Snow Disposal Facility engineering services, and preliminary and detail design of a 8.9 ha site and servicing study for adjacent industrial area, Region of Ottawa-Carleton.  The construction cost was $800,000.
 
 
Clyde Snow Disposal Facility engineering and design of a 6 ha site in accordance with City of Ottawa environmental objectives and optimization to accommodate multi-use.



 
Water Resources:

 
Design, field services and impact analysis for water quality and quantity, for the Conroy, Michael and Clyde snow disposal facilities, Region of Ottawa-Carleton.
 
 
Watershed Management Plans, Mississippi Valley, Rideau Valley and Raisin Region Conservation Authorities.
 
 
Master Drainage Plans for the Villages of Richmond and Stittsville, Goulbourn Township; Manotick, Rideau Township; Carp, West Carleton Township and Moodie Drive Industrial Area, City of Nepean.
 
 
Water quality and quantity monitoring, Sawmill Creek and Greens Creek.
 
 
Floodplain mapping of Ottawa, Rideau, and St. Lawrence Rivers and Stevens Creek.
 
 
Study on streamflow forecasting using remote sensing for hydroelectric projects,  Environment Canada.
 
 
Sand Lake Dam stability analysis and flood impact analysis, using DAMBRK and OTTHYMO, Ministry of Natural Resources.
 
 
Environmental study report, preliminary and final design, and field services for the $1,200,000 channelization project, Rideau Valley Conservation Authority, and the $3,000,000 stormwater management facility, including ultra-violet disinfection, on Sawmill Creek, City of Gloucester.
 
 
Integrated watershed management plans for the Sawmill Creek, Greens Creek and Wistiwasing River drainage basins.
 
 
Carp River Watershed and subwatershed study, including groundwater, hydrogeology, geomorphology and natural environment components for a 31,000 ha drainage area.



 
Land Development:

 
Amberwood Village Development, including roads, sewers, utilities, parks and storm water management facilities with a total value of $8,000,000.
 
 
Gloucester Delta Park industrial development, including municipal services and pit rehabilitation with a value of $1,200,000, Ottawa MacDonald-Cartier International Airport, Transport Canada.
 
 
Roads, municipal services, grading and stormwater management for the 40 ha Kanata South Business Park, with a construction value of $3,000,000, City of Kanata.
 
 
Site servicing and grading for the First City Barrhaven Shopping Center, City of Nepean.
 
 
Coventry Road townhouse development, Phoenix Homes.
 
 
Serviceability study and reports on lands for potentially large developments in Cumberland, Nepean, Kanata and Gloucester for private developers.



 
Operational Planning:

 
Operational review of the Public Works organizational structure and service delivery to the Town of Bosanquet, BDO Dunwoody.
 
 
Review of current practices and policies on maintenance and installation of hydrant valves and water service connections, Region of Ottawa-Carleton.
 
 
Functional assessment and proposed plan for the operations division, organizational structure and development of facilities for the City of Gloucester.
 
 
Field study of proprietary patching materials for winter pavement repairs, City of Ottawa.
 
 
Snow Disposal Study, design, development and implementation of a computerized route optimization model, City of Nepean.
 
 
Information Management Study of 911 system, Region of Ottawa-Carleton.
 
 
Operational and Safety Review of various intersections, National Capital Commission.



 
Municipal Drains:

 
Arcand Municipal Drain abandonment report, Township of South Gower.
 
 
Updating of Faulkner, Van Gaal, Monahan, Robson and Mississippi Diversion municipal drains to accommodate urban development and highway construction projects, City of Ottawa.
 
 
Drainage Superintendent, Rideau and South Gower Townships.
 
 
Clean out of Mud Creek, Shouldice and Nelson Municipal Drains.
 
 
Engineers reports under the Municipal Drainage Act for McCordick-Pratt, Thomasing-Solman and Wilson Cowan Drains, Rideau Township.
 
 
Design of a pumping station and related works for the Cranberry Creek Drain, Rideau Township.



 
Environmental/Waste Management:

 
Grenville Dundas and Haliburton County Waste Management Master Plans.
 
 
Manotick water and sewage servicing studies, Township of Rideau.
 
 
Waste Management Implementation plans, Towns of Perth and Arnprior and Townships of Finch, Bathurst, Matilda and North Burgess.
 
 
Ministry of the Environment and Eastern Ontario Health Unit, Part VIII, Private Sewage Abatement Program.
 
 
Private sewage and water systems studies, Villages of Braeside and Battersea, Ministry of the Environment.
 
 
Functional and final design and field services of 54,600 cu.m.  Orleans Reservoir Expansion and 2,400 l/s Forest Ridge Pumping Station with a construction value of $10,000,000, Region of Ottawa-Carleton.



 
Hydrogeology and Environmental Management:

 
Coordination and implementation of detailed hydrogeological investigations including hydrogeochemistry, contaminant chemistry, groundwater modeling, geophysical methods, state-of-the-art field methods, well hydraulics, soil sciences, environmental GIS applications, contaminant appraisals, and site and aquifer restoration.
 
 
Groundwater and soils assessments including water supply assessments, groundwater and soil chemistry, contaminant hydrogeology, terrain investigations, environmental property review assessments, spill investigations (including underground storage tank investigations), waste disposal sites, environmental assessment studies (hydrogeological aspects), contaminant clean-up, communal water supply projects, and environmental audits.
 
 
Environmental audits of existing properties




 
Conference Papers: 
You will need Acrobat Reader to view the projects.
If you do not have Acrobat Reader you can Download it here for free...


 
 
Gloucester Street Feedermain Sliplining


In 1997, the Region of Ottawa-Carleton identified the existing 914 mm watermain in Gloucester Street as a candidate for rehabilitation. The 1.3 kilometer watermain had failed twice in recent years; once in 1981 and again in 1992, both resulting in significant damage.

The project proceeded to construction in April, 1999 and was completed by July 1999. A number of benefits were derived from the project including: 1) improved water system reliability, 2) significant capital and social cost savings and recognition for selecting an innovative approach to the problem, 3) less disruption to community, 4) minimal impact on traffic & roadway, 5) environmental impact reduced, 6) new rehabilitation technique developed.

learn more - .pdf format>>  
learn more - .pdf format (Slide presentation)>>

 

Glen Cairn Trunk Sewer Pilot Biofilter


The Glen Cairn Trunk Sewer has been a source of odours since it was put into service in 1998. High concentrations of hydrogen sulphide gas have historically been observed at the manholes near its upstream end.

Robinson Consultants, in conjunction with the Ainley Group and Odor and Corrosion Technology Consultants Inc., was commissioned to operate and monitor the pilot biofilter on behalf of the City of Ottawa.  The monitoring will permit the optimal performance criteria to be used in the design of the permanent biofilter, which is to be constructed at the same location as the pilot biofilter.

learn more - .pdf format>>

 

Assessment, Rehabilitation and Replacement of Three Large
  Diameter Feedermains in the City of Ottawa


The “A”, “B” and “C” watermains are three of the most important and among the oldest large diameter feedermains in the City of Ottawa’s water distribution system.  They are the sole supply pipes conveying water from the Lemieux Island Water Purification Plant and ultimately supply 60% of the City`s population.  The City of Ottawa’s potable water supply system dates to 1874 and now includes two large water purification plants and a distribution network comprised of over 2400 km (1500 miles) of pipe supplying a population of over 804,000 people.

The study was initiated and undertaken in recognition of the inherent risks stemming from uncertainty about the condition and structural integrity of the ageing pipes.  In addition, the study stems from a need to provide additional capacity for future growth, to accommodate urban renewal objectives in proximity to the location of the existing pipes and to enhance operational flexibility.

learn more - .pdf format>>

 

The Design, Construction and Operation of the Michael Snow
  Disposal Facility in the Region of Ottawa-Carleton (City of Ottawa)


The Design, Construction and Operation of the Michael Snow Disposal Facility in the Region of Ottawa-Carleton (City of Ottawa).

learn more - .pdf format (Slide presentation)>>