Accessibility Tools

Project Description

The original Mill Creek Municipal Drain was constructed in 1956. At that time, the drain terminated at Hwy. 17 and flowed a further 2km through a natural watercourse to its outlet at the Ottawa River. Subsequent years saw significant increases in agricultural activity including clearing of previously forested lands, increased tile drainage, urban development, and the addition of contributing drains.

Increased pressures from upstream drainage in conjunction with poor underlying soil conditions resulted in a significant slope failure on the natural water course section within the village of L’Orignal.

The Township of Champlain tasked Robinson Consultants Inc. with addressing the slope failure as Emergency Work under Section 124 of the Ontario Drainage Act, R.S.O. 1990, and ultimately with full modification and improvement of the Mill Creek Municipal Drain under Section 78 of the Act to incorporate the emergency work and make necessary adjustments for the remainder of the drain. Robinson Consultants Inc. successfully petitioned the Ontario Ministry of Agriculture Food and Rural Affairs for permission to complete the Emergency Work.

Design for the failure area included geotechnical review of the slope failure and adjacent area, drone level LiDAR survey of the failure (conditions were not stable for a standard survey to be completed) and the implementation of specialized geotechnical design incorporating a ballast feature with slope flattening and standard rock protection.

Following the completion of the emergency work, Robinson Consultants Inc. was tasked with preparing an Engineer’s Report for improvement and modification for the full extent of the drain, including incorporating the emergency work. Ensuring sufficient outlet included incorporating as a municipal drain the remainder of the natural watercourse to the outlet at the Ottawa River. Improvements included permanent sediment and erosion control with some deepening and widening of locations restricting flow. Special consideration was required to address the concerns of environmental agencies including the Department of Fisheries and Oceans, Ministry of Natural Resources (acting as the Conservation Authority for this area as it is outside of the jurisdiction of a Conservation Authority), and the Ministry of Environment Conservation and Parks for the protection of Endangered Species.

Additional Info

  • Client Township of Champlain
  • Location Township of Champlain, Ontario
  • Value $2,270,000
  • Key
    • Emergency work addressing slope failure under Section 124 of the Ontario Drainage Act, R.S.O. 1990.
    • Full modification and improvement of the Mill Creek Municipal Drain under Section 78 of the Act.
    • Successful petition of the Ontario Ministry of Agriculture Food and Rural Affairs
    • Permanent sediment and erosion control with some deepening and widening of locations restricting flow.
  • ImageOne ImageOne
  • ImageTwo ImageTwo
  • ImageThree ImageThree

Project Description

Robinson Land Development (RLD) were retained to provide a servicing, grading, and stormwater management (SWM) design for a proposed three building campus located at 383/ 385 Terry Fox Drive in the City of Ottawa, Ontario. The industrial zoned site included one existing building and two new 5-storey buildings with associated parking.

The project also included road modifications (RMA) for the extension of the existing Hines Road to provide an additional access to the campus.

The portion of the site to be developed was 7.44 hectares in area and was bounded by existing developments on all four sides. Due to the high imperviousness of the site, four on-site SWM facilities were constructed to meet the quantity and quality storage requirements. The facilities were designed to provide level two protection by the use of river stone, granular, and sand layers to filter the runoff. Inlet control devices (ICD) were utilized in the outlets of each facility to control the rate of the stormwater outflow from the site.

The site grading involved the detailed grading design of over 35,000 square metres of asphalt area which was accomplished via minimal underground infrastructure. Specifically, the majority of the site was designed to sheet flow to the on-site SWM facilities.

The proposed buildings were serviced with water and sanitary via connections to the existing infrastructure within Hines Road. The buildings were also provided with storm services via a connection to the existing storm sewer located on the adjacent 5050 Innovation site.

RLD was also engaged to seek approvals for Environmental Compliance Applications (ECA) which required extensive facilitation with the MOECC, City and neighbouring property (which contained an existing SWM facility previously designed to control and treat drainage from a portion of the site). Due to the complexity of the project, four ECA applications were required to be submitted to the MOECC for the site.

Additional Info

  • Client Ciena
  • Location Ottawa, Ontario
  • Value --
  • Key
    • Servicing, grading, and stormwater management design
    • Hines Road RMA
    • Four ECA Applications
    • Four on-site SWM facilities
    • 44 hectare site
  • ImageOne ImageOne
  • ImageTwo ImageTwo
  • ImageThree ImageThree

Project Description

The Chenier-Jeaurond Municipal Drain is a new drain, petitioned by local property owners Under Section 4 of the Ontario Drainage Act, R.S.O., 1990. Property owners were concerned that the existing watercourse comprised of an Award Drain (constructed in the late 1800s under a predecessor to the Drainage Act), private ditches, and natural wet areas did not provide sufficient outlet to protect crops during the growing season. Improvement and incorporation as a municipal drain was required to accommodate modern agricultural practices and allow for sufficient outlet and future maintenance.

The Township of North Glengarry appointed Robinson Consultants Inc. under Section 8 of the Ontario Drainage Act, R.S.O. 1990, as the Drainage Engineer to prepare a report for the future construction of the Chenier-Jeaurond Municipal Drain.

Design included the deepening and widening of the existing watercourse, incorporation as a municipal drain and establishing permanent sediment and erosion control features. Provisions were made for private farm crossings that accommodated modern farming equipment and sufficient outlet for surface and subsurface (tile) drainage. Special consideration was given to address the concerns of environmental agencies including the Department of Fisheries and Oceans, Raisin Region Conservation Authority, and the Ministry of Natural Resources.

Additional Info

  • Client Township of North Glengarry
  • Location North Glengarry, Ontario
  • Value $390,000.00
  • Key
    • Section 4 of the Ontario Drainage Act
    • Deepening and widening of the existing watercourse
    • Establishment of permanent sediment and erosion control features
    • Private farm crossings to accommodate modern farming equipment
Monday, 24 January 2022 16:35

Areas of Discipline

Written by
Wednesday, 12 January 2022 16:19

Construction Services

Written by

For more information

Please contact

Construction Services Solutions

Robinson Consultants Inc. integrated contract administration and inspection teams are comprised of key design team members, such as the Project Manager and Project Engineer, which ensures a seamless transition from design to contract administration. This team approach ensures that important design considerations, operational constraints, environmental mitigations, safety hazards, and public and stakeholder concerns, are thoroughly understood by the contract administration team.

Roles and responsibilities are clearly identified at the outset of construction including critical communication protocols between the owner, stakeholders, contractors, and our in-house team.

Our contract administration and inspection teams utilize an electronic diary and documentation system to allow for timely dissemination of information that includes photos of current operations directly to the project team so that real time updates are available. This facilitates effective decision making as required during construction to prevent unnecessary delays and repetition of work.

Our service fundamentals are quality, quantity, schedule, communications, environment, and safety.

What We Provide

Our construction services include:

  • Certificate of payment
  • Changes in the work
  • Dispute resolution
  • Warranty inspections
  • Submittal reviews
  • Material management
  • Quality assurance
  • Management and monitoring of contractor schedule
  • Constructability reviews
  • Monitoring the effectiveness of operational constraints
  • Construction staging
  • Monitoring adherence to Pedestrian and Traffic Management Plans
  • Issue identification
  • Risk management
  • Construction layout
  • Topographic surveys
  • As-built information 
  • Third party verification using GPS, total station, or optical levels
Page 4 of 6